JX9210 Sharp Laser Printer Replacement Parts
Parts List
Category | Part Number | Description | Demand | Availability |
---|---|---|---|---|
Holder | CHLDZ0040GC71 | Sharp #2 Fuse Ass'y Caz Jx921024 | Ships in 10 days 61.19 | |
Gear, Wheel | NGERH0080GCZZ | Sharp 10 Pu Roller Gear Jx921 | Ships in 10 days 8.35 | |
Pipe, Tube, Hose, Fitting | PPIPP0003GCZ1 | Sharp 11 Pu Clutch Sleeve | Ships in 10 days 6.25 | |
Spring | MSPRT0137GCAZ | Sharp 12 Spring I\o Msprt0137gczz | Ships in 10 days 6.25 | |
Pipe, Tube, Hose, Fitting | PPIPP0006GCZ2 | Sharp 13 R Sleeve I/o Ppipp0006gcz1 | Ships in 10 days 6.25 | |
LBOSZ0058GCZZ | Sharp 14 Pu Roller Boss | Ships in 10 days 8.35 | ||
Suspension & Shock Absorption | PMLT-0054GCAZ | Sharp Absorber I/o Gczz27 | Ships in 10 days 6.25 | |
Suspension & Shock Absorption | PMLT-0053GCAZ | Sharp Absorber I/o Pmlt-0053gczz28 | Ships in 10 days 6.25 | |
QACCD7614QCN1 | Sharp Ac Cord(125v 10A) Baq Jx5 | Ships in 10 days 39.85 | ||
DHAI-0103GCZZ | Sharp Ac Harness(100v Series) Cab276 | Ships in 10 days 6.25 | ||
Socket | QSOCA0004GCZZ | Sharp Ac Inlet(m1908-b) (Cn101) Cag74 | Ships in 10 days 14.65 | |
Filter | RFILN0002GCZZ | Sharp Beads Filter(bp53ra04506050m)115 | Ships in 10 days 6.25 | |
Filter | RFILN0003GCZZ | Sharp Beads Filter(sbt-0140w-a) (L20117 | Ships in 10 days 17.80 | |
Bearing | NBRGP0266FCZZ | Sharp Bearing (Jpn A Rank) I/o L46 | Ships in 10 days 6.25 | |
Bearing | NBRGP0032GCZ2 | Sharp Bearing I\o Nbrgp0032gczz3 | Ships in 10 days 6.25 | |
Belt, Pulley | NBLTH0008GCA1 | Sharp Belt I/o Nblth0008gcz11 | Ships in 10 days 6.25 | |
Cabinet | LSUPP0006GCZZ | Sharp Cab-sprt-l Cad Jx9210x41 | Ships in 10 days 6.25 | |
Capacitor | VCFYJU2EA153K | Sharp Capactior(250wv 0.15Uf) (C409)38 | Ships in 10 days 6.25 | |
IC | VCKYPU1HB103K | Sharp Capactior(50wv 0.01Uf) (C507)48 | Ships in 10 days 6.25 | |
VCCCPU1HH220J | Sharp Capactior(50wv 22Pf) (C521) Ca59 | Ships in 10 days 6.25 | ||
Coil | RCILZ0001GCZZ | Sharp Choke Coil(360uh) (L201) Cal116 | Ships in 10 days 23.05 | |
Label | TLABH0108GCZZ | Sharp Class 1 Label Egi(200v Series)29 | Ships in 10 days 6.25 | |
Connector | QCNCM7014SC0B | Sharp Connector(2pin) (Cn201) Bad80 | Ships in 10 days 6.25 | |
Connector | QCNCM0861FCZZ | Sharp Connector(3b-ph) (Cn202) Cab81 | Ships in 10 days 6.25 | |
Connector | QCNCW0053GCZZ | Sharp Connector(9pin) (Cn301) Cad82 | Ships in 10 days 6.25 | |
NFANP0003GCZZ | Sharp Cooling Fan Caf Jx9210x5 | Ships in 10 days 11.50 | ||
RCORF0006GCZZ | Sharp Core(fpc2520) Cal Jx921045 | Ships in 10 days 23.05 | ||
Cover,Cap | PCOVP0038GCAZ | Sharp Cover I/o Pcovp0038gczz26 | Ships in 10 days 6.25 | |
RCRSZ0017GCZZ | Sharp Crystal(14.513385mhz) (X301) C264 | Ships in 10 days 17.80 | ||
RCRSZ0018GCZZ | Sharp Crystal(53.358186mhz) (X501) C265 | Ships in 10 days 23.05 | ||
Roller | NROLP0037GCZZ | Sharp Delivery Roller Cab Jx9212 | Ships in 10 days 6.25 | |
Plate | LPLTM0163GCZZ | Sharp Discharger Plate Cae Jx916 | Ships in 10 days 8.35 | |
Lever | MLEVP0039GCZZ | Sharp Dr Lock Lever L Cac Jx9219 | Ships in 10 days 6.25 | |
Lever | MLEVP0038GCZZ | Sharp Dr Lock Lever R Cac Jx926 | Ships in 10 days 6.25 | |
Spring | MSPRP0158GCZZ | Sharp Dr Lock Spring Cac Jx9217 | Ships in 10 days 6.25 | |
Duct, Vent | PDUC-0001GCZZ | Sharp Duct Sheet Cae Jx9210x38 | Ships in 10 days 8.35 | |
PSHEP0122GCZZ | Sharp Duct Sheet Cae Jx9210x4 | Ships in 10 days 8.35 | ||
Plate | LFIX-0003GCZZ | Sharp Dv Fixer Cac Jx9210x9 | Ships in 10 days 6.25 | |
QSLP-0032GCZZ | Sharp Dv Terminal Cad Jx9210x12 | Ships in 10 days 6.25 | ||
Gear, Wheel | NGERH0075GCZ1 | Sharp Dv-i-gear A Caf Jx9210x3 | Ships in 10 days 11.50 | |
Gear, Wheel | NGERH0076GCZZ | Sharp Dv-i-gear B Cac Jx9210x2 | Ships in 10 days 6.25 | |
QSLP-0028GCZZ | Sharp Earth Terminal Cae Jx92115 | Ships in 10 days 8.35 | ||
Bearing | NBRGP0031GCZZ | Sharp Fan Bearing Cac Jx9210x6 | Ships in 10 days 6.25 | |
Case | PCASZ0019GCZZ | Sharp Fan Duct A Caf Jx9210x23 | Ships in 10 days 11.50 | |
Suspension & Shock Absorption | PMLT-0051GCZZ | Sharp Fd Cushion L Cac Jx9210x18 | Ships in 10 days 6.25 | |
Suspension & Shock Absorption | PMLT-0052GCZZ | Sharp Fd Cushion S Cac Jx9210x19 | Ships in 10 days 6.25 | |
Container | LSOU-0009GCZZ | Sharp Fd Exit Tray Caq Jx9210x55 | Ships in 10 days 39.85 | |
Gear, Wheel | NGERH0081GCZZ | Sharp Fd Idle Gear Cac Jx9210x7 | Ships in 10 days 6.25 | |
PSEL-0121GCZZ | Sharp Fd Seal Cac Jx9210x15 | Ships in 10 days 6.25 | ||
PSHEP0156GCZZ | Sharp Fd Sheet Cad Jx9210x20 | Ships in 10 days 6.25 | ||
PSHEP0169GCZZ | Sharp Fd Tray Sheet Cac Jx921024 | Ships in 10 days 6.25 | ||
Spring | MSPRP0157GCZZ | Sharp Fd-psv-spring Cad Jx921011 | Ships in 10 days 6.25 | |
Disk | UFLPC0031GCZZ | Sharp Floppy Disk For Us Model | Ships in 10 days 39.85 | |
QSLP-0030GCZZ | Sharp Fu Ac Terminal C Cad Jx917 | Ships in 10 days 6.25 | ||
Bearing | NBRGC0034GCZ1 | Sharp Fu Bearing L Cad Jx9210x15 | Ships in 10 days 6.25 | |
Bearing | NBRGC0035GCZ1 | Sharp Fu Bearing R Cae Jx9210x10 | Ships in 10 days 8.35 | |
Belt, Pulley | NBLTT0018GCZZ | Sharp Fu Belt Bag Jx9210x35 | Ships in 10 days 14.65 | |
Gear, Wheel | NGERH0077GCZZ | Sharp Fu Clutch Gear A Cac Jx922 | Ships in 10 days 6.25 | |
Gear, Wheel | NGERH0078GCZZ | Sharp Fu Clutch Gear B Cac Jx920 | Ships in 10 days 6.25 | |
Lever | MLEVP0037GCZZ | Sharp Fu Clutch Lever Cab Jx9219 | Ships in 10 days 6.25 | |
Cover,Cap | PCOVP0072GCZZ | Sharp Fu Cover A Cag Jx9210x20 | Ships in 10 days 14.65 | |
Cover,Cap | PCOVP0040GCZZ | Sharp Fu Cover Car Jx9210x6 | Ships in 10 days 44.05 | |
Gear, Wheel | NGERH0074GCZZ | Sharp Fu Idle Gear Cac Jx9210x21 | Ships in 10 days 6.25 | |
Knob, Dial, Button | JKNBZ0004GCZZ | Sharp Fu Knob Cac Jx9210x2 | Ships in 10 days 6.25 | |
Plate | CPLTM0227GC51 | Sharp Fu Plate Cas Jx9210x20 | Ships in 10 days 31.66 | |
Spring | MSPRT0226GCAZ | Sharp Fu Roller Spring Cab Jx917 | Ships in 10 days 6.25 | |
Roller | NROLP0092GCZZ | Sharp Fu Roller-a Cac Jx9210x34 | Ships in 10 days 6.25 | |
Roller | NROLP0093GCZZ | Sharp Fu Roller-b Cac Jx9210x16 | Ships in 10 days 6.25 | |
QSLP-0029GCZZ | Sharp Fu Terminal Cad Jx9210x5 | Ships in 10 days 6.25 | ||
PBARM0001GCZ1 | Sharp Fu-ac Cord Cae Jx9210x16 | Ships in 10 days 8.35 | ||
PSHEP0158GCZZ | Sharp Fu-gnd-sheet Cad Jx9210x32 | Ships in 10 days 6.25 | ||
Roller | NROLP0091GCZZ | Sharp Fu-psv Roller Cag Jx921018 | Ships in 10 days 9.40 | |
Spring | MSPRT0141GCZ1 | Sharp Fu-psv Spring Cac Jx921017 | Ships in 10 days 6.25 | |
Spacer | PSPAZ0026GCZZ | Sharp Fu-und-bearing Cad Jx92133 | Ships in 10 days 6.25 | |
Fuse, Thermal Fuse, Breaker | QFS-T0005GCZZ | Sharp Fuse Aaq Jx9210x 008 | Ships in 10 days 39.85 | |
Holder | QFSHB0001GCZZ | Sharp Fuse Holder(h0451) Cab J284 | Ships in 10 days 6.25 | |
Fuse, Thermal Fuse, Breaker | QFS-C1323QCZZ | Sharp Fuse(s3.15/250tl)(200v Series)105 | Ships in 10 days 8.35 | |
Fuse, Thermal Fuse, Breaker | QFS-C0330QCZZ | Sharp Fuse(s3/125nrt Mini)(100v Seri104 | Ships in 10 days 11.50 | |
Fuse, Thermal Fuse, Breaker | QFS-C0430QCZZ | Sharp Fuse(s8/125nrt Mini)(100v Seri101 | Ships in 10 days 11.50 | |
Lamp | RLMPU0010GCZ1 | Sharp Fuser Lamp | Ships in 10 days 80.80 | |
Gear, Wheel | NGERH0083GCZ1 | Sharp Fusing Gear(27t) Cac Jx912 | Ships in 10 days 8.35 | |
DHAI-0070GCZZ | Sharp Fusing Harness 1(100V Series)76 | Ships in 10 days 6.25 | ||
DHAI-0071GCZZ | Sharp Fusing Harness 2(100V Series)78 | Ships in 10 days 6.25 | ||
DUNTW0100GCZZ | Sharp Fusing Unit(100v Serier) Ebg901 | Ships in 10 days 97.22 | ||
Ring | PRNGP0026FCZZ | Sharp G Ring Caa Jx9210x7 | Ships in 10 days 6.25 | |
Gear, Wheel | NGERH0072GCZ1 | Sharp Gear I/o Ngerh0072gczz18 | Ships in 10 days 6.25 | |
Plate | LPLTM0159GCZZ | Sharp Gear Plate Cad Jx9210x15 | Ships in 10 days 6.25 | |
Plate | LPLTM0157GCZZ | Sharp Heat Sink Cag Jx9210x279 | Ships in 10 days 14.65 | |
Lamp | RLMPU0011GCZ1 | Sharp Heater Lamp(200v Series) Bax14 | Ships in 10 days 80.80 | |
Transformer | RTRNZ0011GCZZ | Sharp Hv Transformer 1 (T401) Bal257 | Ships in 10 days 23.05 | |
VHVICPN25//-1 | Sharp Ic Protector(icpn25) (Icp301)114 | Ships in 10 days 6.25 | ||
IC | VHI377P8-000/ | Sharp Ic(377p8-000) (Ic304) Bbc110 | Ships in 10 days 132.25 | |
IC | VHILZ9AT31/-1 | Sharp Ic(lz9at30) (Ic501) Bba112 | Ships in 10 days 111.25 | |
IC | VHIMC74HC10-1 | Sharp Ic(mc74hc10) (Ic305) Bae111 | Ships in 10 days 8.35 | |
IC | VHITA7291AS-18 | Sharp Ic(ta7291s) (Ic301) Baf107 | Ships in 10 days 14.65 | |
IC | VHITC5148AZ70 | Sharp Ic(tc5148az70) (Ic504) Bbg113 | Ships in 10 days 178.45 | |
IC | VHIULN2003AN18 | Sharp Ic(uln2003an1) (Ic303) Bae109 | Ships in 10 days 8.35 | |
PSHEP0149GCZZ | Sharp L-guide Sheet Cac Jx921060 | Ships in 10 days 6.25 | ||
Led | VHPGL3EG8//-1 | Sharp Led(gl3eg8) (Led301) Baa144 | Ships in 10 days 6.25 | |
PSEL-0122GCZZ | Sharp Lfut-seal Cac Jx9210x37 | Ships in 10 days 6.25 | ||
Guide | PGIDM0045GCZZ | Sharp Light Guide Cad Jx9210x56 | Ships in 10 days 6.25 | |
Frame | LFRM-0027GCZZ | Sharp Lower Frame Cax Jx9210x11 | Ships in 10 days 80.80 | |
Switch | QSW-M7032XCZZ | Sharp Microswitch(ss-5fl-3d)(10e) (S256 | Ships in 10 days 17.80 | |
Pump, Motor | RMOTN0019GCZ1 | Sharp Motor I/o Rmotn0023gczz,0019gc7 | Ships in 10 days 70.30 | |
Gear, Wheel | NGERH0071GCZZ | Sharp Motor Idle Gear Cac Jx9217 | Ships in 10 days 6.25 | |
Nut | XNGSN30-18000 | Sharp Nut(m3) Cac Jx9210x4 | Ships in 10 days 6.25 | |
Lever | MLEVP0040GCZZ | Sharp P-in Lever Cac Jx9210x24 | Ships in 10 days 6.25 | |
LPLTP0211GCZZ | Sharp Paper Holder (The Flap On Top,holds Printed Papr | Ships in 10 days 7.36 | ||
PTME-0022GCZZ | Sharp Pawl I/o Ptme-0020gczz22 | Ships in 10 days 11.50 | ||
VHPGP1S53V/-1 | Sharp Photo Interruptor(gp1s53v) (Pd147 | Ships in 10 days 6.25 | ||
VHPGL3HS8//-1 | Sharp Photo Transistor(gl3hs8) (Led3145 | Ships in 10 days 6.25 | ||
Sensor, Thermistor, Thermostat | VHRS21ME4F/-1 | Sharp Photo Triac(s21me4f) (Pd101) B146 | Ships in 10 days 17.80 | |
RPLU-0003GCZ2 | Sharp Plunger I/o Rplu-0003gcz1 Jpn2 | Ships in 10 days 27.25 | ||
Lever | MLEVP0045GCZZ | Sharp Po Actuator Cac Jx9210x25 | Ships in 10 days 6.25 | |
Roller | NROLP0095GCZZ | Sharp Po Roller-n Cah Jx9210x19 | Ships in 10 days 12.55 | |
Transformer | CTRNP0007GC51 | Sharp Power Transformer Unit(120v) B34 | Ships in 10 days 100.75 | |
Cover,Cap | PCOVP0046GCZ1 | Sharp Pu Gear Cover Cac Jx921011 | Ships in 10 days 6.25 | |
Gear, Wheel | NGERH0094GCZZ | Sharp Pu Idle Gear A Cac Jx92110 | Ships in 10 days 6.25 | |
Gear, Wheel | NGERH0095GCZZ | Sharp Pu Idle Gear B Cad Jx92113 | Ships in 10 days 6.25 | |
Gear, Wheel | NGERH0096GCZZ | Sharp Pu Idle Gear C Cac Jx92114 | Ships in 10 days 6.25 | |
Cover,Cap | PCOVP0077GCZZ | Sharp Pwb Cover Cag Jx9210x36 | Ships in 10 days 14.65 | |
PSEL-0118GCZZ | Sharp R Cut Seal Cad Jx9210x58 | Ships in 10 days 6.25 | ||
Relay | RRLYV3110QCZZ | Sharp Relay(100v Series) (Ry101) Ban255 | Ships in 10 days 31.45 | |
Roller | NROLP0056GCA1 | Sharp Roller I/o Nrolp0056gcz115 | Ships in 10 days 26.20 | |
Roller | NROLP0057GCAZ | Sharp Roller I/o Nrolp0057gczz1 | Ships in 10 days 9.40 | |
Roller | NROLP0060GCZ2 | Sharp Roller I/o Nrolp0060gcz11 | Ships in 10 days 55.74 | |
Roller | NROLP0066GCAZ | Sharp Roller I/o Nrolp0066gczz18 | Ships in 10 days 7.36 | |
Roller | NROLM0061GCZ2 | Sharp Roller I\o Nrolm0061gcz113 | Ships in 10 days 50.14 | |
Leg, Foot, Caster | GLEGG0003GCZZ | Sharp Rubber Foot Cab Jx9210x24 | Ships in 10 days 6.25 | |
DHAI-0069GCZZ | Sharp Safety Earth Harness Cad275 | Ships in 10 days 6.25 | ||
Spring | MSPRP0136GCZZ | Sharp Safety Sw. Spring Cad Jx39 | Ships in 10 days 6.25 | |
Screw | XBPBZ40P06K00 | Sharp Screw I/o Xbpsn40p06k0030 | Ships in 10 days 6.25 | |
Screw | XEBS730P10000 | Sharp Screw(3x10) Caa Jx9210x29 | Ships in 10 days 6.25 | |
Screw | XEBSN30P16000 | Sharp Screw(3x16) Cab Jx9210x38 | No | |
Screw | XBPSD30P06K00 | Sharp Screw(3x6k) Caa Jx9210x286 | Ships in 10 days 6.25 | |
Screw | LX-UZ3006NCZZ | Sharp Screw(m3x6(zmc3a)) Caa J33 | Ships in 10 days 6.25 | |
Screw | AA-XHBSD30P06000 | Sharp Screw(m3x6) Caa Jx9210x29 | Ships in 10 days 6.25 | |
Screw | XEBY730P08000 | Sharp Screw(m3x8) Caa Jx9210x12 | Ships in 10 days 6.25 | |
Plate | LPLTP0162GCZ1 | Sharp Separate Plate Cad Jx92110 | Ships in 10 days 6.96 | |
PSHEG0113GCZ1 | Sharp Separate Sheet Caf Jx9219 | Ships in 10 days 11.50 | ||
Spring | MSPRD0227GCZZ | Sharp Separate Spring-a Cac Jx23 | Ships in 10 days 6.25 | |
PSHEP0163GCZZ | Sharp Shading Sheet A Cac Jx9222 | Ships in 10 days 6.25 | ||
PSHEP0164GCZZ | Sharp Shading Sheet B Cak Jx9223 | Ships in 10 days 20.95 | ||
PSHEP0166GCZZ | Sharp Shading Sheet C Cac Jx9221 | Ships in 10 days 6.25 | ||
PSHEP0165GCZZ | Sharp Shading Sheet D Cab Jx9220 | Ships in 10 days 6.25 | ||
PSHEP0171GCZZ | Sharp Shading Sheet E Caf Jx9224 | Ships in 10 days 11.50 | ||
PSHEP0115GCZ3 | Sharp Sheet I\o Pshep0115gcz222 | Ships in 10 days 48.25 | ||
PSHEP0111GCZZ | Sharp Shield Sheet A Cag Jx92126 | Ships in 10 days 14.65 | ||
PSHEP0112GCZZ | Sharp Shield Sheet B Cah Jx92127 | Ships in 10 days 17.80 | ||
Lever | MLEVP0046GCZZ | Sharp Sleeve Release Lever Cae5 | Ships in 10 days 8.35 | |
Spring | MSPRC0159GCAZ | Sharp Spring I/o Gczz17 | Ships in 10 days 6.25 | |
Spring | MSPRC0133GCA1 | Sharp Spring I/o Msprc0133gcz127 | Ships in 10 days 6.25 | |
Spring | MSPRC0135GCAZ | Sharp Spring I/o Msprc0135gczz23 | Ships in 10 days 6.25 | |
Spring | MSPRC0139GCAZ | Sharp Spring I/o Msprc0139gczz8 | Ships in 10 days 6.25 | |
Spring | MSPRC0142GCA1 | Sharp Spring I/o Msprc0142gcz15 | Ships in 10 days 6.25 | |
Spring | MSPRC0143GCA1 | Sharp Spring I/o Msprc0143gcz132 | Ships in 10 days 6.25 | |
Spring | MSPRC0149GCAZ | Sharp Spring I/o Msprc0149gczz8 | Ships in 10 days 6.25 | |
Spring | MSPRC0155GCZ2 | Sharp Spring I/o Msprc0155gcz14 | Ships in 10 days 6.25 | |
Spring | MSPRT0138GCA1 | Sharp Spring I/o Msprt0138gcz113 | Ships in 10 days 6.25 | |
Spring | MSPRT0228GCAZ | Sharp Spring I/o Msprt0228gczz26 | Ships in 10 days 6.25 | |
Spring | MSPRT0229GCA1 | Sharp Spring I/o Msprt0229gczz37 | Ships in 10 days 6.25 | |
Kit | UKOG-0010GCZZ | Sharp Spring Serv Eng Resear19 | Ships in 10 days 13.84 | |
RDTCT0014GCZZ | Sharp Thermistor Bap Jx9210x9 | Ships in 10 days 35.65 | ||
Gear, Wheel | NGERH0082GCZ1 | Sharp Tr Gear Cac Jx9210x2 | Ships in 10 days 6.25 | |
PSHEP0151GCZZ | Sharp Tr Sheet L Cad Jx9210x30 | Ships in 10 days 6.25 | ||
PSHEP0150GCZZ | Sharp Tr Sheet R Cac Jx9210x31 | Ships in 10 days 6.25 | ||
Spring | MSPRC0134GCZZ | Sharp Tr Terminal Spring Cad J29 | Ships in 10 days 6.25 | |
Transformer | RTRNZ0012GCZ1 | Sharp Transformer I/o Rtrnz0012gczz258 | Ships in 10 days 23.05 | |
Transistor | VS2SA673-//-1 | Sharp Transistor(2sa673) (Q301) Bad153 | Ships in 10 days 6.25 | |
Transistor | VS2SC1815//-1 | Sharp Transistor(2sc1815) (Q203) Bad151 | Ships in 10 days 6.25 | |
Transistor | VS2SC3851-/-2 | Sharp Transistor(2sc3851) (Q201) Baf149 | Ships in 10 days 11.50 | |
Transistor | VS2SD1264-/-1 | Sharp Transistor(2sc4883) (Q402) Baf157 | Ships in 10 days 11.50 | |
PSHEP0162GCZZ | Sharp Tray Fr Sheet Cac Jx921025 | Ships in 10 days 6.25 | ||
Lever | MLEVP0041GCZZ | Sharp Tray Lock Lever Cac Jx929 | Ships in 10 days 6.25 | |
Triac, Diode or Resistor | VHSBCR12PM-12 | Sharp Triac(bcr12pm)(100v Series) (T259 | Ships in 10 days 23.05 | |
Sensor, Thermistor, Thermostat | VHSBCR8PM12-1 | Sharp Triac(bcr8pm12)(200v Series) (260 | Ships in 10 days 23.05 | |
Spring | MSPRC0241GCZZ | Sharp Try Spring Cae Jx9210x40 | Ships in 10 days 8.35 | |
PSHEP0157GCZZ | Sharp Upper Frame Sheet Cac Jx18 | Ships in 10 days 6.25 | ||
Frame | CFRM-0029GC72 | Sharp Upper Frame Unit(120v) Ebu501 | Ships in 10 days 174.93 | |
Triac, Diode or Resistor | RVR-M141DQCZZ | Sharp Volume(10kohm) (Vr301) Bad263 | Ships in 10 days 6.25 | |
Triac, Diode or Resistor | RVR-MB211QCZZ | Sharp Volume(220ohm) (Vr201) Bad262 | Ships in 10 days 6.25 | |
Washer | LX-WZ1013HCZZ | Sharp Washer Caa Jx9210x44 | Ships in 10 days 6.25 | |
Washer | LX-WZ0044FCZZ | Sharp Washer(cs-3) Caa Jx9210x8 | Ships in 10 days 6.25 | |
Wire | PSHEP0168GCZ1 | Sharp Wire Sheet B I/o Pshep0168gczz39 | Ships in 10 days 8.35 |